listings
listings
people
Log in
|
Sign up
POSH MARKETS
All
Women
Men
Kids
Home
Electronics
Pets
Beauty & Wellness
Brands
Parties
Posh Shows
How it works
Sell on Poshmark
categories
All Categories
Women
Men
Kids
Home
Pets
Electronics
brands
All Brands
BAMBOO
Eclipse
Hampton Bay
IKEA
jcpenney
Lowes
None
Northcrest
Pier 1
POP MART
Vintage
size
Select a category for specific sizes.
color
All Colors
price
All Prices
Under $25
$25 - $50
$50 - $100
$100 - $250
$250 - $500
Over $500
Custom
To
Apply
shipping
All Items
Free
Discounted + Free
condition
All Conditions
New With Tags
availability
All Items
Available Items
Available + Dropping Soon Items
Dropping Soon Items
Sold Items
blinds
Sort By:
Just Shared
Just Shared
Just In
Price High to Low
Price Low to High
Recently Price Dropped
Likes
Relevance
NEW HOPPVALS CORDLESS WHITE PULL DOWN BLINDS WITH ATTACHMENTS SIZE 38x64”
$50
$78
OS
13 Sets NIP Child / Pet Safety Cord Clip Cleats For Wires and Blind Cords
$12
OS
REDI SHADE Easy Lift Cordless Pleated Fabric Shade NEW
$18
$28
OS
CHANGESHADE Cordless 1” Vinyl Horizontal Blind NEW!!
$35
$45
OS
2 Pack Blackout Plated Blind, color white
$49
$43
OS
NWT Room Darkening panels faux silk in copper 84 inches x 74 inches wide
$31
$59
OS
LEVOLOR 1-in White Aluminum Mini Blinds 23”x64” New In Box Cut To Width.
$29
23”x64”
36x72in Cordless Blinds
$26
OS
Cordless Bamboo Shades
$22
OS
Roman Shades New 31x48
$20
OS
Cordless Shades New 28x64
$20
OS
Zebra Roller Shades
$26
OS
LazBlinds Cordless Cellular Shades, No Tools No Drill Blackout Honeycomb shade
$30
$79
OS
ECLIPSE Kendall Green Blackout Rod-Pocket Curtain Panel Single Panel
$10
$20
OS
No-Drill Cordless Horizontal Mini Blinds – 47.5" W x 64" H Tool-Inside Mount ...
$34
$63
OS
No Drill Cordless Aluminum Mini Blinds S-Curve Blinds Darkening 30" W x 64" H
$30
$56
OS
28" W x 72" L No Drill Cordless Zebra Shades Blinds for Windows Grey Bloom
$30
$51
OS
LazBlinds 25"W x 64"L Cordless Polyester Roman Shades, No Drill, Off White New
$31
$42
OS
LazBlinds Cordless Cellular Shades White 27” W x 36'' H, Blackout Thermal
$32
$40
OS
IKEA Ingamaj Panel Curtain Light Blind Blue Natural 24x118" NEW 002.127.14
$25
OS
IKEA FONSTERVIVA Panel Curtain Light Blind Green Natural 24x118" NEW 202.726.98
$25
OS
New Solar Roller Shades Light Filtering Window Blinds for Heat 26W x 72H
$26
$49
OS
CLEARANCE NEW IN BOX LUXERY CELLULAR CUSTOM ORDERED SHADES
$125
$1,500
OS
1 Vintage Brown Wood Plantation Vertical Blinds Stained Shutter Window Treatment
$97
$550
OS
69x36 Belgian Flax Linen Light Filtering Grey Beige Roman Cordless Shade Curtain
$35
$200
OS
New Top Care Products White 1 inch Light Filtering Cordless Blinds 29 X 64
$13
$38
OS
Blue Surprise Ball Toy - Stitch-Themed Collectible
$10
$20
Boys & Girls
NWT Mystery Minis Labubu Plush Blind Bag Multi Color Kids Keychain Holder
$10
$25
Boy & Girl
LazBlinds No Tools No Drill Cordless Bamboo Roman Shades Blinds 26.5'' x 64"
$39
$69
OS
Levelor white 46.5”vertical replacement panels 13 panel
$25
$60
46.5”
White Hampton Bay Custom Cut Cordless 1" Room Darkening Vinyl Blinds 27"x42" NIB
$10
OS
NORTHCREST | TUSCANY | NWT | 60” X 36” set of tiers | (one set of tiers)
$7
$60
60”x36”
Motorized Smart Blinds Remote Control Solar Powered Cordless 45”W x 54”H Silver
$74
$120
45x54”
Cordless Cellular Shades No Tools No Drill Blackout Honeycomb Taupe 43”x48” NEW
$19
$49
OS
Mini blinds, new in box.
$16
$35
OS
New NIB Pier 1 Kids Red Cotton Fabric Window Blind & Valance 36" x 72"
$20
$80
OS
Hunter Douglas Silhouette A-Deux 28.5 x 70
$190
$300
28.5 x 70
Top Down Bottom Up Cellular Shades Cordless Blackout Blinds 26" W x 50" H, White
$55
$87
OS
Hunter Douglas Powerview Motorized 73.5 x 45.375
$390
$600
73.5 x 45.375
Hunter Douglas Motorized Silhouette Powerview 77.125 x 55.75
$490
$700
77.125 x 55.75
Share this Style Tag to your Networks
blinds
PROTIP:
Fashion is better when shared, so get to it!
Facebook
Email
Copy Link
Add A Message